Cable shown during build process.      Cable required all runs to be shielded     Completed cable on a jig board prior
A wire jig board was used to attain      and covered with protective sleeving.       to removal and packaging.
the correct break-out pattern for         All runs were covered with shield
multiple cable offshoots.                      braid and overlapped, then to attain a
                                                            positive bond the shield braids were
                                                            linked together with a shield "drain"
                                                            wire.


         
Close-up of Multiplexer connector           Close-up of finished cable - J1/J2          Completed cable ready to be
showing internal routing of wires and      connector.                                              packaged.   
identified resistors.